|
Example: Appliqué design is 40 square
inches (B), contains 4400 stitches (C) and the
cut piece price is $ 1.40. We are running the
machine at 650 spm (A) and our shop costs per
hour (D) as below. |
|
|
|
|
Average stitches per minute
(spm) |
(A) 650 spm |
|
Size of appliqué in square
inches |
(B) 40 sq. in. |
|
(multiply design length by
design width) |
|
|
Stitch count of appliqué
design |
(C) 4400 stitches |
|
Pricing structure for your
shop |
(D) see below per hour |
- a. Price per hour
|
|
|
|
|
|
CALCULATION |
|
1. Calculate price per
minute |
|
- a. ___________ ÷ 60
(minutes)
|
(F)___________ ppm |
- Price per shop hour
(D)
|
Price per minute |
| |
|
|
First we determine our price
per minute: |
$ 50.00/hr ÷ 60 = $
.84 ppm (F) for Single Head |
| |
$ 62.50/hr ÷ 60 = $ 1.04 ppm (F)
for Four Head |
| |
$ 75.00/hr ÷ 60 = $ 1.25 ppm (F)
for Six Head |